Jump to content

Line 13 (Shanghai Metro)

From Wikipedia, the free encyclopedia
(Redirected from Line 13, Shanghai Metro)
Line 13
Overview
Other name(s)M5 (planned name);
Expo line (former name in 2010)
Native name上海地铁13号线
StatusOperational
OwnerShanghai Rail Transit Line 13 Development Co., Ltd.
LocalePudong, Huangpu, Jing'an, Putuo, and Jiading districts, Shanghai, China
Termini
Stations36
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
ServicesMainline: Jinyun RoadZhangjiang Road
Partial mainline: Jinyun RoadHuapeng Road
Operator(s)Shanghai No. 2 Metro Operation Co. Ltd.
Depot(s)Beidi Road depot;
Chuanyang River depot
Rolling stock62 Class A 6-car trains
Daily ridership737,800 (2019 peak)[1]
History
CommencedMarch 21, 2007; 17 years ago (2007-03-21) (Expo line section)
OpenedApril 20, 2010; 14 years ago (2010-04-20) (As Expo line from Madang Road to Shibo Avenue)
Last extensionDecember 30, 2018; 5 years ago (2018-12-30)
ClosedNovember 2, 2010; 13 years ago (2010-11-02) (Expo line)
ReopenedDecember 30, 2012; 11 years ago (2012-12-30)
Technical
Line length43.3 km (26.91 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines 1.5kV DC
Operating speed80 km/h (50 mph)
Average speed: 32.8 km/h (20 mph)
SignallingALSTOM Urbalis CBTC
Route map
To scale geographic map:

Line 13 is a north-west to south-east line of the Shanghai Metro network. It runs between Jinyun Road in Jiading and Zhangjiang Road in Pudong. It was once used as a dedicated line (Expo line) for the World Expo to serve the 2010 Shanghai World Expo. The line is colored pink on system maps.

History

[edit]

Special Phase

[edit]

The Special Phase of Line 13 operated between Madang Road and Shibo Avenue, during the 2010 Shanghai World Expo. Following the end of the Expo, this phase was closed. This part of the line reopened on December 19, 2015, along with the full opening of the line.

1st Phase

[edit]

The 1st Phase of Line 13 ran between all the stations between Jinyun Road and Jinshajiang Road, with 7 stations. The section opened in December 2012.[2]

2nd Phase and 3rd Phase

[edit]

The two phases ran from Changqing Road to Zhangjiang Road in Zhangjiang Hi-Tech Park region. The rest of the line was opened on December 19, 2015.





Shanghai Metro Line 13 opening history
Segment Commencemed Opened Length Station(s) Name Investment
Madang Road — Shibo Avenue 21 Mar 2007 20 Apr 2010 4.0 km (2.49 mi) 3 Expo line (special phase) ¥1.338 billion
closed:
2 Nov 2010 Temporary ceased operation -3
Jinyun Road — Jinshajiang Road 28 Dec 2008 30 Dec 2012 9.9 km (6.15 mi) 5 Phase 1 (1st section) ¥12.417 billion
South Qilianshan Road 15 Jun 2013 Infill station 1
Daduhe Road 1 Nov 2014 Infill station 1
Jinshajiang Road — Changshou Road 15 Nov 2011 28 Dec 2014 2.9 km (1.8 mi) 3 Phase 1 (2nd section)
Changshou Road — West Nanjing Road 15 Nov 2011 19 Dec 2015 2.6 km (1.6 mi) 4 Phase 1 (3rd section)
West Nanjing Road — Madang Road 20 Nov 2009 2.8 km (1.7 mi) 2 Expo line (1st section) ¥4.521 billion
Madang Road — Shibo Avenue Reentered operation 3
Shibo Avenue — Changqing Road 30 Dec 2018 1.0 km (0.6 mi) 1 Expo line (2nd section)
Changqing Road — Middle Huaxia Road 31 Dec 2013 10.5 km (6.5 mi) 8 Phase 2 ¥12.932 billion
Middle Huaxia Road — Zhangjiang Road 30 Mar 2014 4.8 km (3.0 mi) 3 Phase 3
Zhuguang Road - Jinyun Road 28 Jun 2021 end 2025 (exp.) 9.8 km (6.1 mi) 5 West extension ¥12.629 billion
Zhangjiang Road - Dangui Road[3] 28 May 2023 end 2026 (exp.) 4.52 km (2.8 mi) 2 East extension

Stations

[edit]

Service routes

[edit]
Shanghai Metro Line 13 service routes
Routes Station name Connections Distance Location Open-
ing
Plat-
form[4]
M P English Chinese km min
National Exhibition and Convention Center 国家会展中心  2   17  0.00 0.00 0 Minhang u/c Underground Island
Yunle Road 运乐路 1.781 1.781
Jile Road 季乐路 1.120 2.901
Qianwan Park 前湾公园 0.996 3.897
Jidi Road 纪翟路 1.443 5.340
Jinyun Road 金运路 0.00 0.00 0 Jiading 30 Dec 2012[5] Underground Island
West Jinshajiang Road 金沙江西路 1.52 1.52 3
Fengzhuang 丰庄 1.94 3.46 6
South Qilianshan Road 祁连山南路 1.31 4.77 8 Putuo 15 June 2013[6]
Zhenbei Road 真北路 1.48 6.25 11 30 Dec 2012[5]
Daduhe Road 大渡河路  15  1.24 7.49 13 1 Nov
2014[7]
Underground Side
Jinshajiang Road 金沙江路  3   4  1.62 9.11 16 30 Dec 2012[5] Underground Island
Longde Road 隆德路  11  1.21 10.32 18 28 Dec 2014[8]
Wuning Road 武宁路  14  0.85 11.17 20
Changshou Road 长寿路  7  1.08 12.25 22
Jiangning Road 江宁路 0.70 12.95 24 19 Dec 2015[9]
Hanzhong Road 汉中路  1   12  1.63 14.58 27 Jing'an
Shanghai Natural History Museum 自然博物馆 0.65 15.23 28
West Nanjing Road 南京西路  2   12 [i] 0.86 16.09 31 Underground Side
Middle Huaihai Road 淮海中路 0.96 17.05 33 Huangpu Underground Island
Site of the First CPC National Congress · Xintiandi 一大会址·新天地  10  1.21 18.26 35
Madang Road 马当路  9  0.63 18.89 37 20 Apr
2010/
19 Dec 2015[9][ii]
World Expo Museum 世博会博物馆 1.53 20.42 40
Shibo Avenue 世博大道 1.61 22.03 42 Pudong Underground Side & Island
Changqing Road 长清路  7 [iii] 0.89 22.92 44 30 Dec 2018[12] Underground Island
Chengshan Road 成山路  8  1.16 24.08 46
Dongming Road 东明路  6  1.40 25.48 48
Huapeng Road 华鹏路 1.15 26.63 51
Xia'nan Road 下南路 1.82 28.45 53
Beicai 北蔡 1.07 29.52 56
Chenchun Road 陈春路 0.93 30.45 58
Lianxi Road 莲溪路  18  1.34 31.79 60
Middle Huaxia Road 华夏中路  16  1.77 33.56 62 Underground Double Island
Zhongke Road 中科路 1.06 34.62 65 Underground Island
Xuelin Road 学林路 1.96 36.58 68
Zhangjiang Road 张江路 1.69 38.27 70
Middle Gaoke Road 高科中路 u/c Underground Island
Dangui Road 丹桂路
  1. ^ Virtual transfer with line 2 or line 12 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
  2. ^ 20 April 2010-2 November 2010: (as the Expo 2010 line).[10][11]
  3. ^ Virtual transfer with line 7 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.


Important Stations

[edit]

Future Expansion

[edit]
Shanghai Metro Line 13 West Extension

West extension: It will be extended for 9.47 km (5.88 mi) from Jinyun Road station to Zhuguang Road station on line 17 and add 5 stations.[13] The stations are: Jizhai Road station; Fangle Road station; Jile Road station; Yunle Road station; and Zhuguang Road station. Construction started on June 28, 2021.

East extension: is part of Phase III adjustment and starts from the current Zhangjiang Road station and ends at Zhangjiang Jidian Port (area), mainly along Zhangdong Road, with a line length of about 4.1 kilometres (2.5 mi). Both are underground lines with 2 stations.[14]

Station name change

[edit]

Headways

[edit]
Shanghai Metro Line 13 headway[15]
Time Jinyun Road -
Huapeng Road
Huapeng Road -
Zhangjiang Road
Monday - Friday (Working Days)
AM peak 7:30–9:30 About 2 min and 30 sec About 5 min
Off-peak 9:30–17:00 About 6 min
PM peak 17:00–19:30 About 3 min About 6 min
Other
hours
Before 7:30
After 19:30
About 6 – 10 min
Saturday and Sunday (Weekends)
Peak 8:30–20:30 About 5 min
Other
hours
Before 8:30
After 20:30
About 6 - 10 min
Extended Operation Interval (Friday, Saturday)
After 22:30 About 15 min ~ 20 min

Technology

[edit]

Rolling Stock

[edit]

The trains of Line 13 are composed of 6-carriages Class A cars, with a design speed of 80 km/h (50 mph), VVVF AC drive, and a design life of 30 years and are China's first domestically developed trains. Trains have a capacity of about 1,860 people. Carriages are 23.54 metres (77 ft 3 in) in length, 3.0 metres (9 ft 10 in) in width, and 3.8 metres (12 ft 6 in) in height.

09A02 trains (numbers 0942–0945, 0948) were used on Line 13, only used during the 2010 Shanghai World Expo, which were reassigned from line 9 to line 13, all of which have now been transferred back to line 9.

Shanghai Metro Line 13 rolling stock
Fleet numbers Manufacturer Time of
manufac-
turing
Class No
of
car
Assembly[i] Rolling stock Number Notes
144 CRRC Nanjing Puzhen Co., Ltd. 2011-2014 A[ii] 6 Tc+Mp+M+M+Mp+Tc 13A01 1301-1324
(130011-131441)
Original name: AC18.
228 CRRC Nanjing Puzhen Co., Ltd. 2016-2018 A[ii] 6 Tc+Mp+M+M+Mp+Tc 13A02 1325-1362
(131451-133721)
[16]
  1. ^ Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. ^ a b Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.

Future Rolling Stock

[edit]
Shanghai Metro Line 13 future rolling stock
Fleet numbers Manufacturer Time of
manufac-
turing
Class No
of
car
Assembly[i] Rolling stock Number Notes
144 CRRC Nanjing Puzhen Co., Ltd. 2023-2025 A[ii] 6 Tc+Mp+M+M+Mp+Tc 13A03 13063-13086
(133731-135161)
36 CRRC Nanjing Puzhen Co., Ltd. 2025 A[ii] 6 Tc+Mp+M+M+Mp+Tc 13A04 13087-13092
(133731-135161)
  1. ^ Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. ^ a b Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.

References

[edit]
  1. ^ 2019最后一天上海地铁运送客流【1303.35万人次】跨年夜延时加开63列次 (in Chinese). 上海地铁shmetro. 2020-01-02. Retrieved 2020-01-09.
  2. ^ Shanghai Eastday, 7 February 2012.
  3. ^ Yuting, Zhu; Meiping, Yang (28 May 2023). "Shanghai Metro on the right track after 30 years". Shine.com.
  4. ^ 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  5. ^ a b c 13号线一期西段12月30日起载客试运营. Shanghai Metro Official Site. 2012-12-28.
  6. ^ 13号线祁连山南路站6月15日起开站迎客. Shanghai Metro Official Site. 2013-06-14.
  7. ^ 13号线大渡河路站11月1日开站. Shanghai Metro Official Site. 2014-10-29.
  8. ^ 13、16号线12月28日新增5站试运营. Shanghai Metro Official Site. 2014-12-25.
  9. ^ a b 上海地铁运管中心 (2015-12-17). 12月19日起 11、12、13号线新延伸段建成试运营. Shanghai Metro Official Site. Retrieved 2015-12-17.
  10. ^ 上海世博园试运行 中国馆成热点. 中国政府网. 2010-04-20. Retrieved 2015-12-17.
  11. ^ 上海地铁明起取消涉博加班车 13号线2日起暂停. Tencent (QQ) News. 2010-11-01. Archived from the original on 2015-12-22. Retrieved 2015-12-17.
  12. ^ 连接莘庄和闵行 轨道五号线开通试运营. Sina. 2003-11-25.
  13. ^ "《上海市轨道交通13号线西延伸工程选线专项规划》公示". Archived from the original on 2020-11-03. Retrieved 2021-03-10.
  14. ^ "地铁13号线东延伸、21号线一期延伸到上海东站、浦东机场 [The east extension of Metro Line 13 and the first phase of Line 21 extend to Shanghai East Railway Station and Pudong Airport]". June 1, 2021.
  15. ^ "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
  16. ^ 上海地铁十三号线列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.
[edit]